PLEASE USE YOUR BROWSER <BACK< BUTTOM TO RETURN TO RESUME FROM A PHOTO LINK. THANK-YOU

JOHN A. LENTINI, Architect

STEWART INTL AIRPORT

1992-2007

1016 World Trade Way

 New Windsor, NY 12553

                                                                         

124 Allan Street

Cortlandt Manor, NY 10567

(914) 737-2890 Fax -1915

(845) 567-9590

 

February 1, 2013                                         (return to home page)

Re: JOHN A. LENTINI ARCHITECT

 

Ladies & Gentlemen:

     Please find the following information submitted for your use to determine my suitability to work on your upcoming project(s):

 

DATE OF BIRTH: April 3rd, 1950    PLACE OF BIRTH: Brooklyn, NY

 

EDUCATION:    Westchester Community College, Civil Engineering

              Institute of Design and Construction, Brooklyn.

              Equivalency qualifying admission to the NCARB                      

Architectural Licensing exam in Connecticut 1979-1992.

 

LICENSES:     Registered Architect Connecticut and New York 1992, 93.

              First State of Licensing Connecticut March 20,1992

              General Contractor Qualifier, State of Florida 1993 PRESENTLY INACTIVE

 

AFFILIATIONS: Former Member of the American Institute of Architects

              Board member of Cortlandt Manor Assessment Review third term.

              Former Member of Grounds and Building Committee Holy Spirit RC

Church.

 

As of July 4,2006 John A. Lentini Architect has performed 1,050  jobs (commencing 7/93) Consisting of residential, commercial & industrial. Scope & value vary. Specific examples relative to any single category are available upon request.

+/-

 

Selected Professional Design and Management Projects:

Circa/Client            Project                      Value Estimated

---------------------------------------------------------------------

2008 under construction older jobs posted when photos become available.

 

2007

 

Small gas station Canopy  BEFORE & IN PROGRESS

 

Small Upstate Lake  PLAN

 

2006

 

Mid Westchester new Colonial  FRNT & INREAR

 

Putnam Colonial face lift   BEFORE & AFTER

 

Newburgh, NY TINY 2ND FLOOR ADD  

 

2005

 

---------------------------------------------------------------------

Hawthorne, NY  LARGE ADDITION      LONG SPAN/MARGINAL CLEARANCE  1rst Flr Concept

---------------------------------------------------------------------

Croton-on-Hudson, NY CROTON DESIGN COMMENCED 2005 PERMITTED 2007  Colonial    

---------------------------------------------------------------------

Lower Westchester   The fate of the Mac Mansion in jeopardy.

New Rochelle  before     proposed1   proposed2    after

--------------------------------------------------------------------

Lynhurst, NJ       Matthew Oscar Architect Structure by Lentini

 

Pic03

Pic04

Pic05

Pic06

Pic07

Pic08

Pic09

---------------------------------------------------------------------

Peekskill, New York

Deep pit            Storm water management becoming common due to

                   Extra wet hurricane seasons. 2004 had more than

                   Normal southern storms reaching New York State

                   With the intensity of Hurricane Floyd.

---------------------------------------------------------------------

2004

 

C.A.R.S.

Computer Aided     Conversion of garage to service station. Bldg

Repair Services     truncated to permit parking. Tight Site.

 

NEW HOUSE DESIGN   Most popular of the year of those shown to

                   House shoppers. Perspective rendering

2003

 

Sad saga on Hudson One family home on the Hudson under construction

                   work stopped by the efforts of neighbors because

 

Cedar Lane Park    Shine house converted to performing arts theater

                   design work and approvals completed.

 

Cranberry Commons  Balcony concept versus actual construction

 

Wood Kitchen       Croton owner gets 90% credit, Lentini 10%

 

Gable Wall         Cortlandt owner gets 90% credit, Lentini 5% Builder 5%

 

Blind Beam         Custom Lake house, Putnam Valley. What is a blind beam?

 

Colonial Expand    Tricky structural solution removing ½ the existing base

                   walls of Armonk home with out requiring shoring. In Progress.

 

Master Bath design Several variations on a theme

 

Insect damage      Common when siding touches grade.

 

Lake Carmel Alt    Most aggressive alteration of the year. The design

                   Was developed mostly by client & her father. Cut-a-way-

--------------------------------------------------------------------

 

2002

 

 

HUDSON HOUSE DESIGN Unussual, aggressive and daring. Not main stream.

--------------------------------------------------------------------

 

2001

 

Custom NJ Mansion  Concept design was developed with owner who went on to

                   Appointments. Live Search

 

 

---------------------------------------------------------------------

2000

Rev.Eric Cosentino The Episcopal Church Thrift Shop Expansion $30,000

(Rev. Cosentino 914 737-2270, William Meier 737-3787, Jean B 739-5291)

Omni Fit,          Pelham Manor, NY face-lift            cost (unknown)

 

Law Road           Residential addition started by Lentini completed

                   by Oscar. An example in differing design philosophy.

                                                             $300,000+

                   John & Chris R responsible 4 the success of this

                   Project prevailing over the stumblebum(s) designer(s).

 

Red Mill Rd.       Hurricane Floyd Caused surcharge/burden on the rear

                   Of existing foundation of one family dwelling. The

                   Interior of foundation buckled. JL plans provided

                   For fix to replace foundation wall. FixPic01,  

                   FixPic02, FixPic03.

                                                          cost (unknown)

---------------------------------------------------------------------

1999

Dr. Strauss        Conversion to Dentist Office               $50,000

(Project performed with Paul V. Cuomo PE. 845 567-1177)

New Hope Alpha     Expansion to treatment facility          $2,000,000

DASNY, NYS OASA    (Kings Cnty)  

(Project performed with Matthew Oscar Architect 845 371-1444)

Hollowbrook Dev.   New Medical facility (phase one)         $1,000,000

                   Multiple residences in Mahopac

                   New auto dealer in Poughkeepsie

---------------------------------------------------------------------

1998

YML Medical Lab    Structural analysis for new equipment      $ 2,000

(Owner Albert H. Padovani, Director, Yorktown, NY 914 245-3203)

Cortlandt Animal   Site and building improvements             $55,000

(Dr. Leonard Berk 914 737-3608)

T&F Development    Cranberry Commons  16 home Development $8,000,000

                                      Sky shot 1

                                      Sky shot 2   

 

                   Cranberry lot XXX  Design initiated by developer

                   Cranberry lot XXX  Design initiated by owner(popular)

 

P HB DEV.          Pkhlbk    lot XXX  Design initiated by architect        

---------------------------------------------------------------------

1997

Steve Gorenstien   New Bldg design for US Social Security $4,000,000

                   Approximately 36,000 square feet, Bronx, NY

(Project performed with Paul V. Cuomo PE. 845 567-1177)

(Project performed with Matthew Oscar Lead Architect 845 371-1444)

(Project HVAC consultant Joel Bodian)

2008 IMAGE 1

2008 IMAGE 2

2008 IMAGE 3

---------------------------------------------------------------------

1996

 

DONALD AND MURIAL HILL Mahopac, NY

 

Craescott Sub- Division

 

Customization and alteration

 

Other

 

QT MINI BUS BRONX  Convert boat factory to bus storage      $800,000

(Project performed with Paul V. Cuomo PE. 845 567-1177)

CactusJacksTex/Mex Restaurant Project, Cortlandt Man, NY    unknown

                   Restaurant Project, Elmsford, NY         unknown

(Manager/Owner Scott Kazan 914 345-3334, 914 526-2222)

---------------------------------------------------------------------

1995

Mama Bravo         NY Pizza Kitchen & Cafe East view Mall   $250,000

                   NY Pizza Kitchen & Cafe Eastpoint Mall   $250,000

(Project performed with Paul V. Cuomo PE. 845 567-1177)

---------------------------------------------------------------------

1994

Dr. CT Shen        Buddhist Refectory revisions             unknown

(Owner Chuang Yen Monastery , Kent Cliffs, NY)

                   (Buddha Hall Statue by others in progress)

Mama Bravo,        NY Pizza Kitchen & Cafe Henrietta        $250,000

(Project performed with Paul V. Cuomo PE. 845 567-1177)

---------------------------------------------------------------------

1993

Pan Hellenic Import Improvements to Hunts Point Market       $ 20,000

Rubin Brothers Imp. Retrofit warehouse to freezer storage    $175,000

---------------------------------------------------------------------

1992

 

---------------------------------------------------------------------

 

1991

---------------------------------------------------------------------

 

1990

Allan Street       Dormer to existing cape                  $ 50,000

 

EMPLOYED      

1987 - 1993

              

        BY      Jolent Associates, Inc., Peekskill, NY

                and Ralph P. Albanese, Architect. 

                      

    Project     Owls Head Waste Water Treatment Alteration.

    Describe    Convert Grit Chamber into offices.

    Activities  Masonry unit Estimator, Project Management.

    Reference   John Picone Co./BCD Brickworks Inc.

    Value                                                    Sub-contract    $800,000

              

    Project     Bronx and Manhattan Housing Renewal.

    Describe    Gut Restoration of various projects.

    Activities  Estimator for carpentry, masonry, Project Management.

    Reference   Condado Const. Corp., PRC Group/Melcara, Procida Const.Corp.

                Old Curiosity Properties, JMM Masonry Inc.

    Value                                                   Sub-contracts $10,000,000

              

    Project     Bronx Lebanon Hospital, Fulton Street, Bronx, NY.

    Describe    New CMU and plank hi-rise hospital structure.

    Activities  Estimator for plank and masonry, Project Management.

    Reference   Turner Construction Co., BCD Masonry, Inc.

    Value                                                    Sub-contracts  $2,300,000

              

    Project     Westchester Correctional Facility, Valhalla, NY.

    Describe    New mid-rise jail facility.

    Activities  Estimator for masonry unit, Project Management.

    Reference   Morse Diesel, Worth Construction, BCD Masonry, Inc.

    Value                                                     Sub-contract  $6,700,000

              

    Project     Marriott Financial Center, NY, NY.

    Describe    New hi-rise (40 stories) concrete masonry building.

    Activities  Estimator for masonry units, Project Manager.

    Reference   Marson Construction, Inc./ BCD Masonry, Inc.

    Value                                                     Sub-contract  $2,000,000

              

    Project     Sara Hale High School, Brooklyn, NY.

    Describe    "Bridged"& altered existing occupied school buildings.

    Activities  Estimator for masonry, Project Management.

    Reference   Arnel Const, Schl Cnst Athrty, Lopez Brickworks, Inc.

    Value                                                     Sub-contract   $400,000

1986 - 1987

              

        BY      Worth Construction Co. Inc., Bethel, Ct.

              

    Project     White Sales Condo, Mahopac, NY.

    Describe    New Mid-rise masonry condominium.

    Activities  Resident Superintendent for 25% of project.

    Reference   Art McDonald, Sponsor.

    Value                                                                $3,000,000

              

    Project     Ogden Corporate Headquarters, Lincoln Park, NJ.

    Describe    New mid-rise steel, glass and curtain office building.

    Activities  Assistant superintendent of construction (resident).

    Reference   Joseph Pontoriero, Developer

    Value                                                                $10,000,000

              

1985 - 1986

              

        BY      Zoldan Equities, Inc., White Plains, NY

              

    Project     Sharon Farms, Greenburg, NY.

    Describe    25 new single-family frame dwelling development.

    Activities  Resident Construction Super and customizing Draftsman.

    Reference   Alex Zoldan, Esq., Sponsor.

    Value                                                             $3,000,000

              

1983 - 1985

              

        BY      The Buddhist Association of the U.S., Bronx, NY

              

    Project     Chuang Yen Mnstry, Kuan Yin Hall & Rfctry, KentClffs, NY.

    Describe    2 new pagoda style glu-lam Temples, site development.

    Activities  Full charge resident Construction Manager.

    Reference   Edward Valeri, A.I.A. Project Architect.

    Value                                                             $3,000,000

              

    Project     Temple of Enlightenment, Bronx, NY.

    Describe    Retrofit existing structure for thermal insulation.

    Activities  Designed and supervised operation.

    Reference   Dr. C. T. Shen, V.P.

    Value                                                              $10,000

            

1977 - 1982

              

        BY      Caristo Construction Corp, Brooklyn, NY

              

    Project     Our Lady of Hope RC Church, Middle Village, NY

    Describe    New Glu-Lam and masonry "octagonal" Church

    Activities  Resident Construction Super 1% - 100% completion.

    Reference   John Strange, RA Architect/ Arch Diocese of NY.

    Value                                                             $1,100,000

              

    Project     Tropical Asia Orientation Center, Bronx Zoo, NY

    Describe    New Animal exhibit and entry to existing Tram ride.

    Activities  Resident Construction Super 25% - 100% completion.

    Reference   Herbert Reimer RA., Dept of General Services, N.Y.C.

    Value                                                             $2,000,000

              

    Project     Public School 397, Brooklyn, NY

    Describe    New mid-rise steel and masonry building.

    Activities  Resident Construction Super for super structure const.

    Reference   Board of Ed project.

    Value                                                              $2,000,000

              

    Project     Public School 380, Brooklyn, NY

    Describe    New mid-rise steel and masonry building.

    Activities  Assistant resident Construction Super.

    Reference   Board of Ed project.

    Value                                                              $2,500,000

              

    Project     Grace Urban Renewal Family & Senior Housing, Newark, NJ.

    Describe    New 365 units 23 Low & 2 Hi-Rise Masonry Bldgs.

    Activities  Clerk of the Works, Asst. Super and Layout Engineer.

    Reference   Porta And Ripa, Morristown, NJ, Architects/Planners.

    Value                                                              $14,000,000

              

1970 - 1977

              

        BY      Dominick Salvati and Son, Architects, Brooklyn, NY and

                Ralph P. Albanese, Architect.

              

    Project     Astroland, Coney Island, NY.

    Describe    Illustration and legalization of amusement park.

    Activities  Job Captain of field measurement, drafting and filing.

    Reference   Dewey and Jerry Albert Owners.

              

    Project     Cumberland Packing Plant, Brooklyn, NY.

    Describe    New MFG Development and land acquisition.

    Activities  Draftsman.

    Reference   Anthony Salvati, RA.

              

    Project     Continental Bakeries, Various facilities in NY area

    Describe    New and Altered projects.

    Activities  Draftsman.

    Reference   Anthony Salvati, RA.

              

    Project     Duffield Street Day Care, Brooklyn, NY

    Describe    New Steel and Masonry Building

    Activities  Draftsman.

    Reference   Anthony Salvati, RA.

              

    Project     The Brooklieum water front restoration proposal.

    Describe    Proposed land use under Brooklyn Bridge presentation.

    Activities  Draftsman.

    Reference   Anthony Salvati, RA., Lawrence Goldberg Job Captain

              

    Project     Various Restoration, Alteration and Zoning Appeals.

    Describe    Owner and contractor projects for upgrade/expansion.

    Activities  Draftsman, Building Department Liaison.

    Reference   Anthony Salvati, Harriet Jacobs, Gasper Gallo.

   

    Project     Fort Hamilton Parkway Collapse

    Describe    Review and evaluation of damage caused by excavation

   

    Project     Other collapses

    Activities  Administrative

   

    Project     World Trade Center, tenant lease space layout drawings.

    Describe    Measure, draft and conform space to tenants wishes.

    Activities  Measure, Draft.

    Reference   Anthony Salvati Jr.

1968 - 1969

        BY      Albert E. Wheeler Land Surveyors

                Bronx, New York

    Projects    Layout, Title and Land Surveying

    Describe    Member of Field Party

    Activities  Rodman & Draftsman

 

 

 

PLEASE USE YOUR BROWSER <BACK< BUTTOM TO RETURN TO RESUME FROM A PHOTO LINK. THANK-YOU

 

John A. Lentini

 

Budget examples:

Add 2nd Floor

Double House to right

Cheap plan expensive House

Early 90 s Developments 1

Early 00 s Developments 2

Residential projects of interest 3

Other Hse4

Other Hse5

Other Hse6

Other Hse7

Other Hse8

Other Hse9

 

Jorge House 2001

Hanging in Adam West’s Reception Area

Sun Room 1989 01   02

 

Raised Raised Ranch Xample

 

 

 

 

(work in progress)

 

(return to home page)